GRIDCo Management Pre-Inspects 200MW Amandi Energy GIS Plant – Aboadze, WR
A delegation comprising some GRIDCo Management staff, and the Takoradi Operational Area Team has conducted a pre-inspection of the Amandi Energy (trading under the name of Twin City Energy) Gas Insulated System (GIS) Substation Facility, located at Aboadze in the Western Region. Twin City Energy is a Combined Cycle Power Plant with an installed capacity