Energy Minister Inspects Emergency Tower Restoration Works at Ashaiman
The Minister for Energy and Green Transition, Dr. John Abdulai Jinapor, and his Deputy, Honourable Richard Gyan-Mensah, have inspected emergency restoration works on
GRIDCo Joins African Power Utilities for the 2026 APUA Annual Meetings in Accra
The Association of Power Utilities of Africa (APUA) marked its 60th Annual General Meeting in Accra, Ghana, at the Mövenpick Ambassador Hotel. The
GRIDCo to Launch a Green Office/Waste Separation Initiative
As part of efforts to strengthen environmental sustainability practices within the Company, GRIDCo is set to commence the implementation of a Green Office
Akosombo Switchyard Restoration Advances with Key Cabling Works
Phase Two of the Akosombo Switchyard Restoration Project is steadily progressing, with teams installing additional control cables between the switchyard and the Akosombo
Energy Minister, GRIDCo and ECG Brief Media on the K1-K2 Project
The Minister for Energy and Green Transition, Dr. John Abdulai Jinapor, has engaged the media in Kumasi on the Ahodwo to Anwomaso (K1-K2)161kV
Akosombo Restoration on Course: Chief Executive Inspects Interim Control Room
It has been ten (10) weeks since the 23rd April 2026 fire incident ravaged the GRIDCo Akosombo Control Room, reducing its 161kV Switchyard





